Rose Bay Project

Protecting Off-Form Concrete and New Stone Floors

Toro protected the off-form concrete columns with Bull Board 5.0 and Bull Board Corner Guards. Inside the property, Bull Board 3.0 protected the newly laid stone flooring. The lower level of site traffic allowed Toro and the builder to use the lighter board, providing suitable protection without the added cost of a heavier system.

Location

Rose Bay

SQM

~150m2

Products used

Bull Board 3.0, 5.0 & Corner Guards

Raising the standard of site protection.

Raising the standard of site protection.

Close-up of a worker's foot in a tan work boot, stepping on a red floor marked with safety lines, with construction tools and equipment in the background.

Find the Right Bull Board for Your Site

Instantly calculate the right protection setup for your project including recommended board thickness, estimated quantities, tape requirements and site allowance.

Previous
Previous

Warehouse Asset Refurbishment & Repositioning

Next
Next

Cronulla Sharks Leagues Club