Warehouse Asset Refurbishment & Repositioning

Slab Protection for an Active Warehouse Refurbishment

Machinery needed to operate across the existing finished concrete slab during the warehouse refurbishment and repositioning works. Toro supplied unbranded Bull Board 5.0 to create a durable layer that crews could lay, relocate and remove as the work progressed. This gave the client practical protection without permanently covering or marking the existing slab.

Location

Undisclosed

SQM

~2000m2

Products used

Bull Board 5.0

Client/Builder/Architect

Plan Group

Raising the standard of site protection.

Raising the standard of site protection.

Close-up of a worker's foot in a tan work boot, stepping on a red floor marked with safety lines, with construction tools and equipment in the background.

Find the Right Bull Board for Your Site

Instantly calculate the right protection setup for your project including recommended board thickness, estimated quantities, tape requirements and site allowance.

Previous
Previous

Harbourside

Next
Next

Rose Bay Project